Product Development Dashboard
Pipeline overview — all product requests tracked from idea to mass production
Design Review → Prototype by Rudi Hartono
Trial Production → Approval by Sri Wahyuni
Approval → Mass Production by Admin
Rejected — Formula issue by Budi Santoso
Prototype → Trial Production by Eko Prasetyo
Mass Production Sign-off by Direktur
Request Table
All product development requests with stage and SLA tracking
| Ref No. | Product Name | Category | Submitted | Stage | PIC | SLA | Action |
|---|---|---|---|---|---|---|---|
| REQ-2025-038 | Cat Besi Anti-Karat #7 | Industrial | 02 Jun 2025 | Prototype | Rudi Hartono | On Time | |
| REQ-2025-037 | Cat Tembok Putih Ultra | Interior | 28 May 2025 | Design Review | Sri Wahyuni | On Time | |
| REQ-2025-036 | Cat Eksterior Glossy+ | Eksterior | 25 May 2025 | New Submission | Budi Santoso | Warning | |
| REQ-2025-035 | Cat Tembok Exterior HQ | Eksterior | 20 May 2025 | Approval | Sri Wahyuni | On Time | |
| REQ-2025-034 | Cat Eksterior Weather+ | Eksterior | 15 May 2025 | On Hold | Budi Santoso | Overdue | |
| REQ-2025-033 | Cat Interior Matte Pro | Interior | 12 May 2025 | Trial Production | Eko Prasetyo | On Time | |
| REQ-2025-032 | Cat Primer Express | Primer | 08 May 2025 | Approval | Rudi Hartono | Warning | |
| REQ-2025-031 | Cat Dekoratif Pearl V2 | Dekoratif | 01 May 2025 | Mass Production | Admin | Completed | |
| REQ-2025-030 | Cat Besi Zinc Chrome | Industrial | 25 Apr 2025 | Mass Production | Admin | Completed | |
| REQ-2025-029 | Cat Interior Kids Safe | Interior | 20 Apr 2025 | Trial Production | Eko Prasetyo | On Time |
Cat Besi Anti-Karat #7
Industrial coating — Zinc-phosphate primer base formula
Category
Industrial Coating
Submitted By
Rudi Hartono (R&D)
Submission Date
02 Jun 2025
Target Completion
30 Jul 2025
Target Market
Industrial B2B — Metal structures
Estimated Volume
8,000 kg/month
Product Brief
High-durability rust-inhibiting primer for metal surfaces. Replaces current Cat Besi #6 formula with improved adhesion on galvanized steel. Target 48-hour flash rust protection. Suitable for outdoor industrial applications including storage tanks, structural steel, and agricultural machinery.
Request submitted with full specification
by Rudi Hartono
Formula spec reviewed and approved for prototype batch
by Sri Wahyuni (QC Head)
2kg trial batch mixing. Adhesion test pending lab results.
by Rudi Hartono
50kg production trial — pending prototype approval
Final sign-off for full production
by Direktur
LPP folder creation and production handoff
Action Required
Complete prototype batch mixing and submit lab test results before advancing to Trial Production.